[BACK]

The new reservoir built next to Minchenbury reservoir, this new reservoir will supply all the warehouses on the wonderland site with drinking water.

There was a hole in the fence here, you could drive through into the back paddock right up to the stables, its now been blocked with a pile of rubble.

The wonderland storm water holding pond has had 90% of the water removed.

Around the back of wonderland the water pumping station is still there, minus the pump which was removed in 2005.

Around the back of wonderland the water pumping station is still there, minus the pump which was removed in 2005.

Around the back of wonderland the water pumping station is still there, minus the pump which was removed in 2005, old ride parts can be seen in the background, scoobies silly stix slide pieces and flume boats.

Around the back of wonderland the top bone yard still remains, you can still see wood from Beastie, This wood was leftover from when The Beastie was built, its been sitting here for 20 years.

Around the back of wonderland.

Back around the front, a new road is almost complete, the streetlights are also in place, this road will go through the park and join onto walgrove road.

This is where the road will join onto walgrove road. the Bush Beast station once stood up ahead.

The new storm water holding pond they are building.

They pumped water from the rain into the corner of the park and let it drain down a Telstra Pit.

They pumped water from the rain into the corner of the park and let it drain down a Telstra Pit.

The Telstra pit where most of the water went.

The Wonderland storm water pond, missing ever more water.

Wonderland storm water holding pond missing a large amount of water.

This is where the water from the holding pond was pumped into water tankers and used to build the new road.
[BACK]